Start-up and Validation
Reliable start-up. Certified performance.
At BRAM-COR, we ensure that every pharmaceutical system is not only engineered to exact specifications, but also launched with precision and care. Our Start-up and Validation services cover every critical phase—from installation and commissioning to testing and training—ensuring full compliance with GMP and international regulatory standards, while delivering optimal system performance from day one.

FAT – Factory Acceptance Test
Before shipping, all BRAM-COR equipment undergoes a complete FAT at our production facility:
Verifies design, functionality, and quality under controlled conditions
Reduces issues during on-site installation
Includes comprehensive documentation and customer approval
SAT – Site Acceptance Test
Once the equipment is installed, SAT is performed at the client’s facility:
Confirms the system performs as expected in its working environment
Final functional checks and compliance testing
Ensures a smooth transition to production use

Commissioning
Our experienced technical team leads a structured and methodical commissioning process to ensure every system operates flawlessly and meets all design and regulatory requirements.
Mechanical and electrical inspections
Software integration and interface verification
Calibration and alignment to process requirements
Supports validation activities and regulatory documentation
Training
We empower your team for long-term success:
On-site and remote operator training
Maintenance and troubleshooting sessions
Custom training programs based on equipment type
Includes user manuals and standard operation procedures (SOPs)
Installation
BRAM-COR coordinates full system installation for maximum efficiency
Our installation process is supervised by specialized BRAM-COR technical staff, ensuring every component is assembled and connected with precision. We strictly adhere to sanitary and safety standards throughout the process, guaranteeing a clean and compliant setup. Each system is seamlessly integrated into your existing production line, ready for validation and efficient operation from the start.