Start-up and Validation

Reliable start-up. Certified performance.

At BRAM-COR, we ensure that every pharmaceutical system is not only engineered to exact specifications, but also launched with precision and care. Our Start-up and Validation services cover every critical phase—from installation and commissioning to testing and training—ensuring full compliance with GMP and international regulatory standards, while delivering optimal system performance from day one.

FAT – Factory Acceptance Test

Before shipping, all BRAM-COR equipment undergoes a complete FAT at our production facility:

Verifies design, functionality, and quality under controlled conditions

Reduces issues during on-site installation

Includes comprehensive documentation and customer approval

SAT – Site Acceptance Test

Once the equipment is installed, SAT is performed at the client’s facility:

Confirms the system performs as expected in its working environment

Final functional checks and compliance testing

Ensures a smooth transition to production use

Commissioning

Our experienced technical team leads a structured and methodical commissioning process to ensure every system operates flawlessly and meets all design and regulatory requirements.
$

Mechanical and electrical inspections

$

Software integration and interface verification

$

Calibration and alignment to process requirements

$

Supports validation activities and regulatory documentation

Training

We empower your team for long-term success:

$

On-site and remote operator training

$

Maintenance and troubleshooting sessions

$

Custom training programs based on equipment type

$

Includes user manuals and standard operation procedures (SOPs)

Installation

BRAM-COR coordinates full system installation for maximum efficiency

Our installation process is supervised by specialized BRAM-COR technical staff, ensuring every component is assembled and connected with precision. We strictly adhere to sanitary and safety standards throughout the process, guaranteeing a clean and compliant setup. Each system is seamlessly integrated into your existing production line, ready for validation and efficient operation from the start.